Exhaust gas self-monitoring program

Time:2018-12-08
Automatic monitoring requirements for exhaust gas pollutants: Calibration and maintenance of automatic monitoring equipment in accordance with the Technical Specifications for Continuous

    Exhaust gas self-monitoring program

   1.Waste gas and wastewater monitoring program

Table 1 Self-monitoring plan

Serial number            Pollution source categoryDrain port number 
Drain port nameMonitoring content (1)Contaminant nameMonitoring facilityAutomatic monitoring of networkingAutomatic monitoring instrument nameAutomatic monitoring facility installation locationAutomatically monitor whether the facility meets the management requirements for installation, operation, maintenance, etc.Manual monitoring sampling method and number (2)Manual monitoring frequency (3)anual measurement method (4)Other information
1
DW001
pH, total cadmium, total lead, total mercury, total arsenic, flowTotal arsenicmanual



Mixed sampling at least 3 mixed samples1 time / seasonWater quality - Determination of total arsenic - Diethyldithiocarbamate silver spectrophotometric method GB 7485-87
2     

DW001
pH, total cadmium, total lead, total mercury, total arsenic, flowTotal mercurymanual



Mixed sampling at least 3 mixed samples1 time / seasonWater quality Determination of total mercury Cold atomic absorption spectrophotometry HJ 597-2011 Replaces GB 7468-87 1 time / quarter
3

DW001
pH, total cadmium, total lead, total mercury, total arsenic, flowTotal leadmanual



Mixed sampling at least 3 mixed samples1 time / seasonWater quality - Determination of copper, zinc, lead and cadmium Atomic absorption spectrophotometric method GB 7475-87
4

DW001
pH, total cadmium, total lead, total mercury, total arsenic, flowTotal cadmmanual



Mixed sampling at least 3 mixed samples1 time / season1 time / seasonWater quality - Determination of copper, zinc, lead and cadmium Atomic absorption spectrophotometric method GB 7475-87
5

DW001
pH, total cadmium, total lead, total mercury, total arsenic, flowpHmanual



Mixed sampling at least 3 mixed samples1 time / season1 time / season
Water quality Determination of pH value Glass electrode method GB/T 6920-86

6

DA001
Flue gas volume, flue gas temperature, flue gas pressure, oxygen contentMercury and its compoundsmanual



Non-continuous sampling at least 31 time / season1 time / seasonFixed source pollution - Determination of mercury - Cold atomic absorption spectrophotometric method (provisional) HJ 543-2009
7

DA001
Flue gas volume, flue gas temperature, flue gas pressure, oxygen contentSmokeautomaticYesSCS-900PM soot automatic monitorMixed flueYesNon-continuous sampling at least 3Online instrument failure 6 hoursBoiler dust test method GB 5468-91 instead of GB 5468-85
8

DA001
Flue gas volume, flue gas temperature, flue gas pressure, oxygen contentNitrogen oxidesautomatic
SCS-900 flue gas automatic monitorMixed flueYesNon-continuous sampling at least 3Online instrument failure 6 hoursFixed pollution source exhaust gas Determination of nitrogen oxides Constant potential electrolysis method HJ 693-2014
9

DA001
Flue gas volume, flue gas temperature, flue gas pressure, oxygen contentSulfur dioxideautomaticYesSCS-900 flue gas automatic monitorMixed flueYesNon-continuous sampling at least 3Online instrument failure 6 hoursDetermination of sulfur dioxide in fixed pollution source exhaust gas. Constant potential electrolysis method HJ/T 57-2000
10

DA001
Flue gas volume, flue gas temperature, flue gas pressure, oxygen contentRingman blackmanualYes


Non-continuous sampling at least 31 time / seasonDetermination of blackness of flue gas from fixed pollution sources. Lingeman smoke blackness map method HJ/T 398-2007
11

Factory boundary
otal suspended particulate matter (aerodynamic equivalent diameter of 100 μm or less)otal suspended particulate matter (aerodynamic equivalent diameter of 100 μm or less)manual



Non-continuous sampling at least 31 time / seasonWeighing method


2.Evaluation criteria for wastewater monitoring results (Schedule 2)

2 Wastewater pollutant discharge implementation standard table

Serial numberDrain port numberDrain port nameType of pollutantNational or local pollutant discharge standards (1)
nameConcentration limit (mg/L)other information
1
DW001
Total arsenicComprehensive discharge standard for water pollutants in Haihe River Basin of Shandong Province DB37/675-20070.5

2
DW001
Total cadmComprehensive discharge standard for water pollutants in Haihe River Basin of Shandong Province DB37/675-20070.1

3
DW001
Total mercuryComprehensive discharge standard for water pollutants in Haihe River Basin of Shandong Province DB37/675-20070.01

4
DW001
PHComprehensive discharge standard for water pollutants in Haihe River Basin of Shandong Province DB37/675-20076-9

5
DW001
Total leadComprehensive discharge standard for water pollutants in Haihe River Basin of Shandong Province DB37/675-20071.0


3.Evaluation criteria for exhaust gas monitoring results (Schedule 3)

Table 3 Exhaust pollutant discharge implementation standard table

Serial numberDrain port numberDrain port nameType of pollutantNational or local pollutant discharge standards (1)other information
name
oncentration limit (mg/Nm3)
3
DA001
Nitrogen oxides"Shandong Province Thermal Power Plant Air Pollutant Emission Standard" Ultra Low Emission No. 2 Amendment Single Lu Quality Supervision Standard [2016] No. 46100

4
DA001
Sulfur dioxide"Shandong Province Thermal Power Plant Air Pollutant Emission Standard" Ultra Low Emission No. 2 Amendment Single Lu Quality Supervision Standard [2016] No. 4635

5
DA001
Smoke"Shandong Province Thermal Power Plant Air Pollutant Emission Standard" Ultra Low Emission No. 2 Amendment Single Lu Quality Supervision Standard [2016] No. 4610

四、Factory boundary noise monitoring program

1、Factory boundary noise monitoring content

Table 4 Noise monitoring at the boundary of the plant

Point layout          

Monitoring project          

Frequency of monitoring             

Monitoring method and   in accordance with

         

Four borders from east to west and north and south of the factory    

Leq        

Once a season             

"Environmental Noise Emission Standards for Industrial Enterprises' Boundaries"

GB12348-2008
         

2、Factory boundary noise evaluation standard

The noise at the boundary of the plant implements the Class 3 standard of GB12348-2008 "Environmental Noise Emission Standard for Industrial Enterprises Boundary", with 晝: 65dB(A) and 55dB(A) at night.


五、Self-monitoring requirements

(1) Automatic monitoring quality assurance

1. Personnel requirements: Persons with more than two training certificates for the effectiveness of the automatic monitoring data of pollution sources issued by the provincial environmental protection authorities.

2. Automatic monitoring requirements for exhaust gas pollutants: Calibration and maintenance of automatic monitoring equipment in accordance with the Technical Specifications for Continuous Monitoring of Flue Gas Emissions from Fixed Sources (Trial) (HJ/T75-2007).

3. Recording requirements: The operation and maintenance records of the automatic monitoring equipment, and the contents of all kinds of original records should be complete and signed by relevant personnel for three years.

(2) Entrusted monitoring
1. Entrusted by the qualified social inspection (supervision) testing agency or the environmental monitoring agency of the environmental protection department to conduct manual self-monitoring on its behalf, and entrusted monitoring must sign an agreement.
2. The environmental monitoring agency of the environmental protection department that undertakes the supervisory monitoring task shall not undertake the self-monitoring entrusted business of the supervised enterprise.

六、Self-monitoring information

(1) Method of publication
1. The enterprise shall promptly report the self-monitoring information to the municipal environmental protection department in accordance with the requirements, and announce the self-monitoring information to the public on the website of the municipal environmental protection department.
2. The company publicly monitors the information through the external website of Gushen Biotechnology Group Co., Ltd.

(2) Announcement content

Company name          

Gushen Biotechnology Group Co., Ltd.  

legal representative                

Zhang Ween                

Production and operation site address            

Middle section of Caiyuan Road, Lingxian Economic Development Zone            

Postal code (1)            

253500                

Industry category              

Bean products manufacturing              

Whether to put into production (2)                

YES               

Production date (3)             

2007-01-01              



Production and operation center center longitude (4)            

116°54′41′′              

Production and operation site center latitude (5)                

37°36′9′′       

Organization Code

             


Unified social credit code             

91371421723850818U                

Technical director         

Zhao Guozhu            

Contact number                

0534-8295258                

Automatic monitoring manufacturer              

Beijing Xuedilong Technology Co., Ltd.             

Commissioned monitoring agency         

                 

Shandong PerryEnvironmental Protection Monitoring Co., Ltd.                        


              

1. Self-monitoring program
2. Self-monitoring projects and results: all monitoring points, monitoring time, pollutant types and concentrations, standard limits, compliance standards, excess standards, pollutant discharge methods and emission destinations
3. Reasons for not conducting self-monitoring;
4. Annual report on pollution source monitoring.

(3) Announcement time limit

1. The basic information of the enterprise shall be announced together with the monitoring data. If the basic information and self-monitoring plan are adjusted and changed, the latest contents shall be announced within five days after the change;

2. Manual monitoring data shall be published after each report is issued;

3. The automatic monitoring data should announce the monitoring results in real time, and the automatic monitoring equipment for exhaust gas is the average value per hour;

4. Announce the annual report of self-monitoring last year before the end of January each year.



主站蜘蛛池模板: 欧美国产国产综合视频| 免费观看国产女人高潮视频| 性夜久久一区国产9人妻| 无码av天天av天天爽| 中文字幕人妻被公上司喝醉| 国产亚洲精品久久久久的角色| 午夜性无码专区| 亚洲一区综合图区| 亚洲人成伊人成综合网无码| 久久国产福利播放| 无码少妇一区二区三区浪潮av| 人妻熟妇乱又伦精品视频| 国产福利视频| 夜夜爽8888天天躁夜夜躁狠狠| 精品人妻一区二区三区蜜桃电| 国产传媒一区二区在线播放| 一区二区在线观看欧美日韩日韩| 国产成人精品三级麻豆| 激情综合色综合啪啪五月丁香| 中文字幕成人精品久久不卡| 丰满无码人妻熟妇无码区| 69国产精品久久久久久人妻| 久久er99国产精品免费| 国产一区二区内射最近更新| 无码av在线一本无码| 国产精品日本亚洲欧美| 国产综合精品女在线观看| 丰满少妇被猛烈进入一区二区| 国产亚洲午夜高清国产拍精品| 成人网站精品久久久久| 少妇久久久久久被弄高潮| 亚洲亚洲人成网站网址| 精品久久久无码中文字幕天天 | 国产一区二区三精品久久久无广告| 一本久道综合在线无码88| 少妇爆乳无码专区网站| 精品亚洲aⅴ无码一区二区三区| 日韩欧美一区二区三区日韩| 色婷婷亚洲婷婷7月| 人妻中出无码中字在线| 亚洲精品国产综合久久一线|